Stens Opens New Distribution Centers
Stens Corporation has announced the opening of two new distribution centers. New facilities located in Jacksonville, FL, and Greenville, SC, bring the total distribution center count for Stens Corporation to seven US locations. The Jacksonville facility is a 20,000 sq. ft. space located at 4102-2 Bulls Bay Highway. The official opening date at Jacksonville was September 17, 2012. Greenville began full distribution center operations on Monday, October 29 at the 202 Industrial Drive location. The Greenville distribution center is 15,000 square feet. With these distribution center additions, nearly all of Stens US mainland customers will now receive next day delivery for orders placed by 2pm.
Related Articles
Latest News
Consumer Reports, Among Equip’s Dealer Education
For the first time ever, a panel of Consumer Reports editors is coming to the blockbuster trade show to talk about what’s driving consumer sentiment when it comes to buying outdoor power equipment in special…
OPEI Hosts 2025 Annual Meeting, Announces Executive Committee
The Outdoor Power Equipment Institute (OPEI), an international trade association representing manufacturers and suppliers of outdoor power equipment, small engines, battery power systems, portable generators, utility and personal transport vehicles, and golf cars, named its…
Updated By Rotary: Battery-Powered Sprayers
Spraying has never been easier thanks to battery-powered sprayer kits from Rotary. The 4-gal. backpack model is powered by a 18 V lithium-ion battery and sprays up to 50 gallons on a full charge. Other…

